Outdoor Light Warm Sport Outerwear Nylon navy Black Winter Jackets and coats for Men
Item: |
jacket |
Outer material: |
94% nylon - 6% elastane |
Grammage: |
250 g/m² |
Colour: |
02 navy/black,
04 anthracite/black,
05 black/black |
Area of use: |
construction industry, industry, logistics |
Standard: |
EN ISO 13688:2013 |
Size: |
S L M XL XXL XXXL |
Description: |
1 pocket on the left sleeve with zip, 2 front pockets with zip, adjustable cuffs, arm ergonomic design, breast mobile phone pocket with E-WARD fabric and badge holder loop closed with zip, flap protecting the chin, front opening with zip, reflex inserts, stretch fabric, wide internal pockets |
Packing: |
1. 1pc/poly bag,10pcs/carton/as your request |
2.hangtag as customer's design |
3.Barcodes stickers for hangatg poly bag/shipping carton as customer design |
4.Carton:2-layer/3-layer,as customer request |
Delivery: |
30-45days after pre-production samples confirmed |
Shipment: |
By sea, by air, By train etc, your forwarder or our |
Payment: |
TT, L/C, D/P, Western Union, Paypal, Money Gram |
Samples: |
3-7 days |
Size chart
In CM |
XS |
S |
M |
L |
XL |
XXL |
3XL |
Chest |
108 |
112 |
116 |
120 |
124 |
128 |
132 |
Sleeve Length |
76 |
78 |
80 |
82 |
84 |
86 |
88 |
Back Length |
69 |
71 |
73 |
75 |
77 |
79 |
81 |
Q1: Are you the factory or trade company?
A:We are the manufacturer and trade company, we have our factory.
Q2: What is the MOQ for raincoats?
A: Usually we ask 500 pieces for our available styles, and 1000 pieces for custom colors and styles.
Q3: What is the lead time for 1000 pieces?
A: Uauslly the lead time will be 20 days for our available styles, and 30-40 days for custom styles.
Q4: Can we custom our logo?
A: Yes, we welcome OEM orders, custom printings are available.
Q5: Can you produce small orders?
A: Yes,we can.But if the order is smaller than MOQ,the cost will a little bit higher.
Q6: How to ensure the product quality?
A: We have strict quality system. From material selection to cut and sew, from beginning production to end of packaging,each process is been carefully inspected by our strong QC department.